Products & Services  /  Fire Door Checking
FDC · CONTINUOUS VERIFICATION

Fire doors, watched automatically.

Sensors confirm communal fire doors are closing properly — continuously. The physical integrity inspection stays a human job; the thing that fails between inspections is watched around the clock.

An Airebo Atom watching a communal fire door close on its closer — closure verified
What it solves

Three problems that disappear

Today: failures found months late

Propped doors flagged same-hour

A wedged or failing door is normally found at the next quarterly check. The sensor flags it the hour it happens.

Today: walk-rounds eat days

Inspections arrive informed

The quarterly inspection still happens — but it arrives with a closure history attached, so effort goes where the risk is.

Today: a photo on someone's phone

Evidence that stands up

Closure events are written at the device and sealed — a record aligned to reg. 10, not a camera roll.

Who it's for

What it does for each of them

Accountable Person (HRBs)

  • Reg. 10 duties evidenced continuously across the block
  • The door that's failed since last quarter can't hide
  • Disclosure-ready closure history for the regulator

Property manager / managing agent

  • Fewer blanket walk-rounds — exceptions only
  • Residents propping doors caught early, addressed with evidence
  • Quarterly inspection packs generate themselves

Social housing operations

  • Door assurance at stock scale, without stock-scale walking
  • A defensible record when complaints or claims arrive
  • Contractor visits targeted at doors that actually failed

Care & supported living manager

  • Compartmentation watched where residents can't self-evacuate
  • CQC-visible assurance, any day of the year
  • No disruption to residents from routine checking
Task
What happens now
With Airebo Atoms
What's produced
Communal door checks
A quarterly walk-round of every door
Closure watched every hour; inspection scheduled with history attached
Continuous closure record + inspection pack
Propped / failing doors
Found when somebody notices
Flagged the same hour, routed as an exception
Exception event + fix trail
Evidence
Checklists and phone photos
Written at the device, sealed on arrival
Reg. 10-aligned door record

Standards: Fire Safety (England) Regulations 2022, reg. 10 · physical integrity inspection remains a competent-person task

From your first building to your last, the process is the same

Survey → findings pack → install.

No rip-and-replace, no procurement marathon. We survey each building, show you exactly where the evidence gaps are, and fit Airebo Atoms to your existing installations.

Step 1 · Week 1

Building survey

A placement survey of your existing installations — what you have, what the standards expect, where the gaps are, and how many Atoms it takes.

Step 2 · Week 2–3

Findings pack

A written, board-ready picture of your current compliance evidence position. Useful whether or not you proceed — yours to keep.

Step 3 · From week 4

Install

Atoms commissioned on the surveyed installations. From day one the building writes its own evidence record.

info@airebo.io ☎ Sales 0333 335 6626 ☎ Support 0333 335 6627